Case Study
6 BEVIS MARKS: MULTIMEDIA VIDEO WALL
Case Study > 6 BEVIS MARKS: MULTIMEDIA VIDEO WALL
20 Jul 2015

A prestigious new office space in the heart of the city is leading the way with a pioneering 15 metre long videowall in its state of the art reception area. Visitors are simultaneously impressed, informed and entertained when they enter Number 6 Bevis Marks with dynamic visual technology from NEC, which delivers a lasting impression.

THE CHALLENGE

The spacious and impactful design of the building naturally extends to the dual entrance reception lobby where the architect, Fletcher Priest, envisioned a dramatic and imposing visual technology installation to welcome and inform visitors whilst establishing the future-facing credentials of tenant corporations. 

With usage to be wide ranging including presentation of artwork as the lobby plays host to artistic exhibitions, a huge videowall installed along one wall was to become the digital centrepiece of the reception area. Key requirements demanded the flexibility to display content from multiple sources or to display a single image across its entirety with control easily managed by staff on reception which is operational 24/7. 

THE SOLUTION

We designed a 26 screen videowall configuring 13 x 2 NEC 55” HD LED backlit displays with Ultra Narrow bezels creating a virtually seamless appearance. Capable of 24/7 operation, the quality and reliability of NEC is crucial to the longevity and performance of the installation. Mounted on Peerless wall brackets, the multiple adjustment enables precise alignment of the screens. 

6 BEVIS MARKS: MULTIMEDIA VIDEO WALL6 BEVIS MARKS: MULTIMEDIA VIDEO WALL6 BEVIS MARKS: MULTIMEDIA VIDEO WALL6 BEVIS MARKS: MULTIMEDIA VIDEO WALL

Stay up to date with our latest news

Sign up to our newsletter by entering your email address below.

Want to accelerate change for your business? Get in touch with us and see how we can help you.